Skip to content
ReBuild Loop
Pre-demolition material intelligence

Know what a building can become before it comes down.

ReBuild Loop turns site evidence into a human-approved materials ledger, recovery plan, and traceable handover pack—before useful assets become mixed waste.

Model proposals never approve their own findings. Named people accept, correct, or block every consequential decision.

Evidence first

Every proposal links back to a photo, file, timecode, or measurement.

Human decided

Approval gates give professionals the final word—and record who decided.

Limitations visible

Unknowns and specialist checks travel with the material, not in hidden notes.

From survey to sign-off

A review workflow, not a black-box waste forecast.

ReBuild Loop separates what the evidence shows, what the model proposes, and what a responsible person has approved.

  1. 01

    Capture what is actually there

    A guided site manifest connects photos, video, plans, BOQs, and measurements to the part of the building they describe.

  2. 02

    Review model proposals

    Each material candidate carries its evidence references, uncertainty, missing information, and required human decision.

  3. 03

    Approve a recovery route

    Rule-based gates separate direct reuse, repair, recycling, specialist review, and EPR-relevant mineral streams.

  4. 04

    Export the recovery pack

    The approved ledger becomes a traceable plan with limitations, evidence links, and a formal sign-off record.

Materials register / sample

Decisions that can be audited.

Inspect the full review
ReferenceMaterial itemEvidenceProposed routeReview state
MAT-014Steel I-sectionIMG-128 · BOQ-41Direct reuseReady for review
MAT-021Timber floor joistsVID-08 · 00:14Repair / reuseClose-up needed
MAT-036Mineral rubbleIMG-203 · ZN-CEPR registerQuantity pending

Demonstration workspace

See the evidence, uncertainty, and approval gate together.

Enter review workbench